Integrated FM Contract — Commercial Office Tower, Abu Dhabi

FM
Abu DhabiCommercial Office24-month AMC

Operational Scope

Full-scope integrated facilities management for a multi-floor commercial office building in central Abu Dhabi. Hard FM covered MEP system maintenance (HVAC, electrical LV panels, plumbing and drainage, fire detection), structured PPM programmes for all building systems, and reactive maintenance with tracked SLA response. Soft FM covered daily cleaning, periodic deep cleaning, pest control, and waste management. The contract included monthly KPI reporting, quarterly management reviews, and documentation compliant with Abu Dhabi Municipality requirements.

Execution Model

Managed under the holding's ISO 9001:2015 quality management system. All PPM activities documented with digital checklists and monthly completion certificates submitted to the client and held for municipality inspection readiness. Response times for reactive maintenance logged and reported against contractual SLAs on a monthly basis. The engagement operated under a single ALBASEM HOLDING contract covering both hard and soft FM.

Measurable Outcomes

PPM completion rate maintained above 95% across all scheduled visits

Zero municipality non-compliance notifications during contract period

Reactive response SLA met on over 98% of logged calls

Civil & Structural Works — Government Facility Upgrade, Abu Dhabi

Contracting
Abu DhabiGovernment / Institutional8 months

Operational Scope

Civil works contracting for an infrastructure and facility upgrade project delivered under a government client framework in Abu Dhabi. Scope included structural reinforcement works, external drainage and paving, landscaping reinstatement, and building fabric renovation across multiple phases. All works required Abu Dhabi Municipality permit compliance and coordination with Civil Defence for fire safety signoff on modified structural elements.

Execution Model

Executed under the holding's ISO 9001:2015 quality management system with method statements, risk assessments, and inspection test plans produced for all work stages. Works were phased to allow the facility to remain partially operational during construction. Authority interface managed directly by the holding's senior technical team, covering permit submissions, stage inspections, and formal handover documentation. HSE managed under ISO 45001:2018 with zero reportable incidents.

Measurable Outcomes

Project delivered within contracted programme — no extension of time claims raised

All authority submissions approved without major revision requests

Zero reportable HSE incidents across all construction phases

MEP Maintenance — Industrial Facility, Abu Dhabi

Maintenance
Abu DhabiIndustrial36-month AMC

Operational Scope

Annual Maintenance Contract for MEP systems at an industrial facility in Abu Dhabi's industrial zone. Scope covered planned preventive maintenance for mechanical systems (chilled water, process cooling, ventilation, compressed air), electrical systems (MV and LV switchgear, distribution boards, standby generators, UPS), and plumbing systems (water tanks, drainage, sanitary). Reactive maintenance coverage was included with defined priority categories and response time SLAs.

Execution Model

PPM delivered on a structured monthly, quarterly, and annual cycle against a documented maintenance plan aligned with equipment manufacturer specifications. All works completed by qualified engineers with formal work permits issued for high-risk activities. Monthly maintenance logs submitted to facility management with remedial action tracking for any defects identified during inspection. The contract operates under the holding's unified ISO 9001:2015 and ISO 45001:2018 framework.

Measurable Outcomes

PPM completion rate above 97% across all monthly and quarterly scheduled visits

Reactive response SLA compliance above 96% across all priority categories

No unplanned equipment downtime attributable to maintenance failure during contract period

Commercial Fit-Out — Office Renovation, Dubai

Contracting
DubaiCommercial Office14 weeks

Operational Scope

Interior fit-out and renovation of a commercial office floor in Dubai, executed for a corporate tenant. Scope included demolition of existing partitioning, installation of new lightweight partition systems, suspended ceiling systems, raised access flooring, MEP modifications (HVAC diffuser relocation, electrical distribution, data and communications infrastructure), and finishes (flooring, painting, joinery). Works required a Dubai Municipality fit-out permit, DEWA approval for electrical modifications, and Civil Defence compliance for revised fire detection layout.

Execution Model

Works executed under the holding's ISO 9001:2015 quality management system with formal permit management, authority submissions, and stage inspections coordinated by the site management team. DEWA submission and approval obtained for all electrical modifications. Civil Defence layout approval obtained before works commenced. Project managed on an accelerated programme to meet the tenant's operational handover deadline. Works sequenced to limit noise and disruption to adjacent occupied floors during business hours.

Measurable Outcomes

Project delivered to programme — zero delay to tenant occupancy handover

All authority permits and approvals obtained without revision requests

No snagging items related to MEP installation at final inspection

Soft FM Services — Institutional Campus, Abu Dhabi

FM
Abu DhabiEducation / Institutional12-month AMC, renewed

Operational Scope

Soft FM services for an institutional campus in Abu Dhabi operating under government oversight. Scope covered daily and periodic internal cleaning of offices, circulation areas, and specialist facilities, external ground maintenance, waste segregation and disposal management, and pest control services. Service delivery required compliance with authority-specific hygiene and safety standards applicable to the building classification. All staff underwent background vetting and authority access clearance procedures before mobilisation.

Execution Model

Service delivered under a documented cleaning specification with defined frequencies, standards, and quality audit procedures. Monthly quality audits conducted by the holding's internal quality team and results reported to the client facility manager. Staff attendance managed through a time and attendance system with monthly reporting. All materials used were approved products aligned with authority standards and the holding's ISO 14001:2015 environmental management requirements.

Measurable Outcomes

Contract renewed at end of initial 12-month period without competitive re-tender

Monthly quality audit scores above agreed KPI threshold throughout contract

Zero authority inspection findings related to cleaning or hygiene standards

Specialist Cleaning — Retail & F&B Facilities, Dubai

FM
DubaiRetail / Hospitality18-month contract

Operational Scope

Specialist cleaning services for a mixed retail and food and beverage facility in Dubai. Scope included daily internal cleaning of retail units and common areas, kitchen duct and grease trap cleaning (municipality-scheduled intervals), deep cleaning of F&B back-of-house areas, drain line jetting and maintenance, and pest control under licensed operator protocol. All activities were coordinated with the facility's operational team to avoid disruption to trading hours.

Execution Model

Specialist cleaning activities scheduled and executed in accordance with Dubai Municipality requirements for F&B operators. Kitchen duct and grease trap cleaning documented with completion certificates and submitted to facility management for regulatory records. All cleaning chemicals used are MSDS-compliant and consistent with the holding's ISO 14001:2015 environmental management framework. Pest control conducted by licensed operators in accordance with Dubai Municipality pest control guidelines.

Measurable Outcomes

Zero regulatory findings from Dubai Municipality F&B hygiene inspections during contract period

All kitchen duct and grease trap cleaning documented and available for authority inspection on demand

Contract scope expanded at renewal to include two additional retail units