Project Background

The client developed a purpose-built commercial office tower in Abu Dhabi for institutional occupancy. The project was structured in two phases: a construction contracting phase involving MEP installation and commissioning, and a subsequent long-term facilities management phase commencing from practical completion and handover. This dual-phase engagement allowed Albasem Holding to develop deep asset knowledge during the construction phase, which was carried forward into the FM contract — enabling a more efficient mobilisation, a more accurate asset register from day one, and a closer understanding of as-built system configurations than would be achievable for an FM contractor entering post-construction.

Construction Phase: MEP Contracting

Albasem Holding was appointed as MEP contractor for the commercial tower, responsible for the design, supply, installation, testing, and commissioning of all mechanical, electrical, and plumbing systems throughout the building. Mechanical Works: Supply and installation of HVAC systems including air handling units, fan coil units, chilled water distribution, BMS integration, and ventilation systems serving all occupied floors, plant rooms, car park levels, and service areas. Electrical Works: MV/LV electrical distribution, main switchboards, sub-distribution boards, lighting systems (including emergency lighting), power distribution to all tenants, UPS systems for critical loads, and earthing and lightning protection. Plumbing Works: Domestic cold and hot water systems, sanitary drainage, stormwater management, fire suppression system pipework and sprinklers, and medical gas provisions for designated areas. Authority Submissions: Management of all authority submissions including ADDC, civil defence, and Abu Dhabi Municipality technical approvals throughout the construction period, coordinating with the main contractor and design team. Commissioning: Full system commissioning, load testing, and witnessing with Abu Dhabi Municipality and civil defence authorities, including preparation of all test and commissioning records for the as-built package.

FM Phase: Integrated Facilities Management

Following practical completion, Albasem Holding transitioned directly to the integrated FM contract, eliminating the mobilisation knowledge gap that typically arises when a new FM contractor enters post-construction. The FM scope covers the complete life of the building from handover, including: Hard Services: PPM and reactive maintenance for all MEP systems installed during the construction phase, including HVAC, electrical distribution, plumbing, fire suppression, lifts, BMS, and building fabric. PPM schedules are aligned with OEM recommendations and ADDC/civil defence requirements. Soft Services: Commercial cleaning of all common areas, office entrances, lobbies, service areas, and car parks. Waste management, pest control, and landscaping management for all external areas. Tenant Services: Helpdesk operations supporting all building tenants with maintenance requests, with priority classification and tracked SLA performance. Tenant move-in/move-out coordination and fit-out works management. Compliance: Management of all statutory compliance obligations applicable to a commercial office tower in Abu Dhabi, including fire safety certification, lift inspections, HVAC hygiene testing, and documentation maintenance for authority inspection readiness.

Outcomes

Construction Phase: MEP works completed within programme and within agreed contract sum. Zero defects identified during civil defence commissioning witnessing. All authority submissions approved without significant delay, enabling the overall project to achieve its target practical completion date. FM Phase (Ongoing): PPM compliance rate maintained above 96% across all asset categories. Zero regulatory non-conformances identified during authority inspection visits. Tenant satisfaction ratings across all occupied floors consistently at or above agreed service level benchmarks. The asset knowledge advantage gained through the construction phase has demonstrably reduced reactive maintenance frequency relative to comparable buildings of similar age and complexity. The FM contract has been extended through an options exercise, reflecting the client's satisfaction with service delivery and the operational performance of the building under Albasem Holding's management.

Related Questions

Can Albasem Holding provide both MEP contracting and subsequent FM for the same building?

Yes. Albasem Holding can structure engagement across both construction and FM phases for the same asset. This approach provides a significant advantage in FM mobilisation, asset knowledge, and as-built system understanding, which translates to more efficient FM delivery from the outset of the operational phase.

What MEP systems does Albasem Holding install in commercial buildings?

Our MEP contracting scope for commercial buildings covers HVAC (air handling, fan coil, chilled water distribution, BMS), electrical distribution (MV/LV, lighting, UPS, emergency systems), plumbing (domestic water, sanitary, fire suppression), and specialist systems as required by the project. We manage all associated authority submissions and commissioning activities.